A Guide to Common Launching Systems

What Are the Different Ship Launching Methods?

Ship floating out from a flooded building dock

Once a ship is completed, how to safely transfer the hull from the slipway into the water is a critical issue that shipyards must consider. This process is commonly referred to as ship launching.

Depending on the ship’s size, the shipyard’s layout, and available equipment, various ship launching methods can be employed, such as gravity launching, transverse launching, floating out from a dry dock, rail transfer, and airbag launching.

These methods work in different ways. Some rely on the hull moving along an inclined slipway; others float the vessel by filling the dry dock with water; and still others use rails, ship carriers, and towing equipment to transfer the vessel from the slipway to the water.

So, what are the differences between common ship launching methods? If a shipyard needs to transfer a vessel between the onshore construction area and the water, what facilities should it consider?

This article will introduce several common types of ship launching methods, their respective operating principles, and key selection factors, and further explain the role of rail systems in ship launching and hauling operations.

Gravity-Based Ship Launching: Moving a Vessel Along a Slipway

Gravity launching is a traditional method of launching ships. The basic principle involves using the ship’s own weight to move the hull down an inclined slipway or launching ramp into the water. Once the hull enters the water and gains sufficient buoyancy, the ship can be released from its original supports, completing the launch.

This gravity-based ship launching method typically requires specially designed slipways, launch chutes, and hull support systems. Depending on the direction in which the vessel enters the water, it can be further classified as longitudinal launching or transverse launching.

End Launching

“End launching” refers to the process in which a vessel enters the water along its fore-and-aft axis, typically with the stern entering the water first.

During this process, the vessel is supported by a slipway, a cradle, or other supporting devices and moves along an inclined slipway. As the hull gradually enters the water, buoyancy and support loads change; therefore, it is necessary to assess the hull’s structural strength, weight distribution, slipway gradient, and water depth in advance.

Longitudinal launching has a well-established technical foundation, but it requires sufficient longitudinal space, and the vessel’s speed upon entry into the water and subsequent movement must be controlled.

Side Launching

Side launching refers to a vessel entering the water with its side facing the water, rather than moving along its length.

This method can reduce the space required for longitudinal launch facilities along the shore under specific site conditions, but it requires more lateral water space and necessitates consideration of the hull’s lateral stability, the impact of entering the water, and surrounding obstacles.

Therefore, there is no universal standard for the advantages and disadvantages of longitudinal versus side launching that applies to all shipyards. The final choice should depend on the hull structure, the shipyard layout, the available water depth, and the stress conditions during the launching process.

Float-Out: Launching a Vessel by Flooding a Dock

Not all ships need to be launched into the water via an inclined slipway. If a ship is completed in a dry dock or construction dock, the hull can gradually gain buoyancy and be released from its supports by flooding the dock.

This method is commonly referred to as a “float-out.” Unlike traditional slipway launches, it relies primarily on changes in water level and the force of buoyancy to transition the hull from its construction position to a floating state.

Dry Dock Launching

A dry dock is a facility for shipbuilding or repair that allows for the control of the water level inside. During construction, the hull is supported by structures such as caissons.

When launching the ship, the shipyard fills the dry dock with water according to a predetermined operating procedure. As the water level rises, the hull gradually gains buoyancy. Once the vessel is safely afloat and meets the required water depth and navigation conditions, subsequent operations to move the vessel out of the dry dock can proceed.

Dry dock launching does not require the vessel to slide into the water along an inclined slipway, but it does require an appropriately sized dry dock, water intake and discharge facilities, and the ability to control the water level.

Floating Dock

A floating drydock is a floating facility capable of adjusting its draft through the use of ballast water; it is used for ship repair, docking, undocking, and related transfer operations.

In a typical floating drydock operation, the height of the floating drydock is adjusted by regulating the ballast water, allowing the vessel to enter a designated position or be lifted out of the water. The specific operation depends on the structure and intended use of the floating drydock.

It is important to note that the structure and operating principles of a floating drydock differ from those of a drydock; the two should not be regarded as entirely identical launching facilities.

Mechanized Ship Launching: Four Common Mechanized Slipway Systems

Mechanized ship launching is a process that utilizes ship launch racks, launch carriages, tracks, winches, and other mechanical equipment to launch a vessel.

Compared to the method that relies solely on the hull’s weight to move along a slipway, mechanized ship launching employs towing equipment, ship-supporting devices, and transfer mechanisms to support the vessel, move it horizontally, adjust the launch angle, and complete the launching operation.

Different mechanized ship launching systems vary in terms of support methods, launching trolley arrangements, and slipway connection methods. Based on the classification used in the naval engineering teaching materials referenced in this article, the following four types can be described.

Mechanized Longitudinal Launching with a Ship Cradle

Mechanized longitudinal launching with a ship cradle refers to the construction of a vessel on an integral or sectional ship cradle equipped with rollers; during launching, the cradle is pulled by a winch along tracks on an inclined slipway into the water.

In this system, the ship cradle supports and moves the hull, while the rollers, tracks, and towing equipment work together to transfer the vessel.

Key Features:

  • This method combines a roller-supported barge with a track system, allowing for movement via mechanical traction.
  • The facility layout is relatively straightforward, making it suitable for projects with the appropriate slipways, tracks, and waterway conditions.
  • The barge height, working space beneath the hull, roller load-bearing capacity, and track foundation must all be taken into account during the design process.
  • During launching, the speed of the barge must be controlled, and changes in support after the hull enters the water must be assessed.

The specific scope of application for this method must be determined based on the vessel’s dimensions, weight, barge structure, and the capacity of the track system.

Two-Support-Point Longitudinal Slipway Launching

Mechanized launching via a two-support-point longitudinal slipway involves using two separate launching carriages to support the vessel. The vessel is towed from a horizontal slipway to an inclined slipway and then slides down the slipway into the water.

The key to this method lies in the support positions of the launching carriage and the changes in forces acting on the hull during movement. Since the load-bearing points are relatively concentrated, the hull structure must be capable of withstanding the corresponding longitudinal bending loads.

Main Features:

  • It can connect a horizontal slipway with an inclined launching chute.
  • The launching carriage and towing equipment must operate in coordination to control the vessel’s movement.
  • It places high demands on the hull’s longitudinal strength, support locations, and load distribution.
  • It is particularly important to assess the forces acting on the hull when it begins to float and the support conditions change.

Therefore, before adopting this method, necessary engineering calculations should be performed, taking into account the hull structure, support arrangement, and launching conditions; the suitability of the system cannot be determined solely based on the launching carriage’s load-bearing capacity.

Longitudinal Slipway Launching with a Variable-Gradient Transfer Area

Mechanized launching via a longitudinal slipway with a variable-gradient transfer area is a method of mechanized launching in which horizontal and variable-gradient sections are installed in the transfer area, enabling the lateral transfer facilities to connect with the longitudinal inclined slipway.

In this system, the lateral transfer mechanism first adjusts the vessel’s position in the horizontal section before connecting to the longitudinal inclined slipway via the variable-gradient section, thereby launching the vessel into the water.

Key features:

  • The horizontal section can connect to the slipway or the transverse transfer area, while the variable-gradient section provides the transition to the inclined slipway.
  • With proper layout, a single launching facility can serve multiple construction locations.
  • The horizontal section, the variable-gradient section, and the inclined slipway must meet corresponding track geometry and load-bearing requirements.
  • When the vessel enters the water, changes in buoyancy, support transitions, and hull stresses must still be evaluated.

This method can be used in shipyards that need to coordinate slipway locations and launching channels, but its specific applicability depends on the site layout, transfer equipment, and vessel structure.

Comb-Type Slipway Launching System

A comb-type slipway launching system typically consists of an inclined slipway and a horizontal transfer section, connected to multiple horizontal slipways arranged on either side of the transfer section.

Slipway trolleys and launching trolleys can each handle transfer tasks in different areas. Depending on the specific system design, both types of equipment can be equipped with corresponding traction devices, thereby reducing the operational requirements when switching between different work areas.

Key Features:

  • Multiple horizontal construction slipways can be connected to the same launching area.
  • Slipway trolleys and launching trolleys handle horizontal transfer and inclined slipway movement, respectively.
  • Different zones can be planned according to the shipyard’s overall layout and constructed in phases, provided engineering conditions are met.
  • Rails, vehicles, support structures, and traction systems must be matched according to their respective loads and movement paths.

Comb-type slipways are suitable for specific shipyards requiring multi-berth layouts and centralized launching facilities. Whether they are suitable for small- and medium-sized vessels, inland waterway vessels, or other vessel types should be determined based on the actual facility design and vessel conditions, rather than by generalization.

What Role Do Rails Play in Mechanized Ship Launching?

In the four types of mechanized launching methods described above, tracks can serve as the path along which the ship-carrying frame or launching trolley travels, helping the equipment move the vessel along a predetermined route.

However, the track layout and equipment configuration vary among different mechanized launching systems. Tracks typically need to be considered in conjunction with the ship-carrying frame, wheels, traction equipment, and track foundations.

In specific projects, the selection and installation requirements for rails typically require verification of the following information:

Track specifications:

Confirmed based on project drawings, wheel dimensions, and design loads.

Track layout:

Determined based on the gradient of the road alignment, track gauge, track spacing, and installation space.

Fastening method:

Matched to the foundation, support structure, and design requirements.

Load-bearing conditions:

Evaluate wheel loads, the weight distribution of the vessel-handling equipment, and the load-bearing capacity of the track foundation.

Operating environment:

Assess material and protective requirements based on exposure to moisture, salt fog, and other corrosive environments.

Therefore, ship launching rails should not be selected based solely on the vessel’s tonnage. Wheel parameters, the structure of the vessel-handling equipment, track layout, and foundation conditions are equally important.

How Can Glory Crane Support Rail-Based Ship Launching Projects?

For shipyards that need to establish a fixed transfer route between the slipway and the water, the rails are a key component that must be carefully selected for mechanized launching systems.

Glory Crane provides rail products for rail-based ship launching and slipway projects, which are used in the ramp rail systems connecting the slipway to the water.

During the project preparation and product selection phases, we recommend first clarifying the following information:

  • Track Specifications and Design Requirements: Determine the appropriate track type and product specifications based on project drawings, wheel dimensions, equipment loads, and track layout requirements.
  • Track Length and Layout: Determine the required lengths and supply configurations based on the ramp route, track spacing, and on-site installation conditions.
  • Track Fastening and Connection: Determine fastening and connection methods based on the track foundation, support structure, and design requirements to ensure that the relevant products are compatible with the system design.
  • On-Site Operating Environment: If the track will be exposed to damp conditions, salt fog, or other corrosive environments for extended periods, material and protective requirements should be considered during the project preparation phase.

For ship launching rail projects, knowing only the approximate tonnage of the vessel is typically insufficient to determine the appropriate rail specifications. Project drawings, wheel dimensions, rail layout, and the design loads of related equipment all influence the final product selection.

Glory Crane can assist in confirming the appropriate rail product requirements based on the drawings and technical specifications provided by the customer. For specific rail types, lengths, processing requirements, and scope of supply, we recommend submitting relevant technical documentation along with your request for quotation to ensure a more accurate match.

It should be noted that rail products are part of the ship launching system. The civil engineering work for the ramp, foundation structure, overall system design, and ship launching safety plan should be determined by the respective project design and construction parties based on actual requirements.

Other Ship Launching Methods: Airbag and Water-Cushion Launching

In addition to the methods described above, shipyards may also use airbag launching or hydrofoil launching, depending on site and equipment conditions. These methods differ from traditional rail-based launching in terms of their support and movement mechanisms.

Airbag Launching

Airbag launching is a method in which a specialized airbag system supports the hull, and the vessel is moved into the water by rolling the airbags in coordination with towing equipment.

Airbag launching can reduce reliance on certain fixed launching facilities, but this does not mean it can be used without prior engineering evaluation. The specifications, quantity, and placement of the airbags, as well as the hull support conditions, ground bearing capacity, launching slope, and towing control, must all be confirmed based on the specific project conditions.

For relevant technical information, refer to the international standard ISO 17682:2013, “Air-Cushion Launching of Ships.” According to official ISO records, this standard covers ships, air cushions, launching ramps, towing devices, launching procedures, and safety measures. It was reconfirmed in 2024, and the current version remains valid.

Water-Cushion Launching

Water-cushion launching involves using a specialized water-cushion device and a high-pressure water supply system to create a water cushion between the support structure and the ground, thereby reducing frictional resistance during movement, and then moving the vessel with the aid of towing equipment.

This method requires specialized water-cushion, water supply, and towing facilities, and has specific requirements regarding ground conditions, support structures, and equipment configuration. Therefore, it should not be considered a universal solution that can be directly adopted by ordinary shipways.

07. How to Choose the Right Ship Launching Method

There is no one-size-fits-all approach to ship launching methods that applies to all shipyards. The actual choice should be based on a comprehensive evaluation that takes into account the hull structure, site conditions, and equipment capabilities.

Selection FactorsKey considerations
Vessel dimensions and structureLength, beam, weight distribution and support requirements
Site layoutBuilding berth location, available waterfront, slipway space and foundations
Water conditionsWater depth, tidal variation, nearby obstructions and clearance after entry
Equipment configurationCapacity of rails, launching cradles, carriages, traction equipment or dock facilities
Long-term operationLaunching frequency, maintenance needs and infrastructure investment
Operational safetyHull loads, stability, movement control and emergency measures

For example, shipyards with suitable dry docks can evaluate the water-injection launching method; shipyards that need to use a fixed passage to transfer vessels between the slipway and the water can consider mechanized slipways and rail-based transfer systems; when site and equipment conditions meet the requirements, air-cushion launching can also be evaluated.

For rail-based launching projects, further confirmation is required regarding rail specifications, the compatibility between wheels and rails, the load capacity of the vessel-supporting equipment, the rail foundation, and the configuration of the traction system.

The U.S. Occupational Safety and Health Administration (OSHA) guidelines on shipbuilding and repair also emphasize that ship launching requires thorough operational planning and that appropriate measures must be taken during the transition of the hull’s support status, the slide into the water, and the subsequent control process.